Barwon Heads Road Upgrade

The Barwon Heads Road Upgrade project duplicates the existing road, enhances intersections along the corridor and removes a level crossing through a new road bridge. Additionally, walking and cycling connections are improved with new shared user paths and signalised intersections.

Services Provided

  • Conducted topsoil assessment and performed soil classification
  • Carried out groundwater monitoring across both portions of the project
  • Acted as the Environmental/Sustainability Manager during the TOC/development phase and the project delivery phase

Client

BMD | Bild Group | FCC

Location

Geelong, Victoria

Value

$360m+

Year

2021 - 2025

Image of road

The Barwon Heads Road Upgrade project duplicates the existing road, enhances intersections along the corridor and removes a level crossing through a new road bridge. Additionally, walking and cycling connections are improved with new shared user paths and signalised intersections.

Services Provided

  • Conducted topsoil assessment and performed soil classification
  • Carried out groundwater monitoring across both portions of the project
  • Acted as the Environmental/Sustainability Manager during the TOC/development phase and the project delivery phase

Related

View All
Image of architecture

Yallourn Power Station PFAS Remediation

  • Contaminated Land Consulting
  • Sustainability Advisory
  • Energy
Image of road

Narre Warren-Cranbourne Road

  • Sustainability Advisory
  • Contaminated Land Consulting
  • Environmental Advisory
  • Transport
Image of outdoors

Great Ocean Road Upgrades

  • Sustainability Advisory
  • Environmental Advisory
  • Transport